Second-Story Additions In Long Beach: The Basics

November 6, 2025
Do you want content like this delivered to your inbox?

Thinking about adding a second story so you can stay put and still gain space? You are not alone. In Long Beach, many owners explore building up to unlock bedrooms, offices, or views without changing addresses. This guide walks you through the basics: zoning and code rules, permits and timelines, structural must‑knows, neighbor‑friendly design tips, and common pitfalls to avoid. Let’s dive in.

What governs a second story

Every vertical addition in Long Beach sits at the intersection of zoning rules, building codes, and site conditions. You will coordinate with City Planning on zoning and with Building & Safety on plan check, permits, and inspections. Start early with the right contacts so you can plan with confidence.

Zoning basics to confirm

Zoning sets your height limit, setbacks, and permitted floor area. The exact rules depend on your property’s zone and any special overlays. Before you sketch ideas, confirm your parcel’s zoning and any design review triggers with the City’s Planning Division. You can start with the City’s Development Services overview and the Planning Division pages to understand submittals and project types.

Many neighborhoods also have historic or conservation overlays. These areas can require design review for exterior changes. If your property sits near the coast or in a mapped flood area, additional standards may apply. Homeowner associations can add their own review timelines, separate from the City.

View rights are often a concern in coastal cities. In Long Beach, private view protections are typically contractual. City staff or design review bodies may consider view impacts during discretionary reviews, but guaranteed private view rights usually come from recorded easements on title. If you suspect any easements or CC&Rs, check your title documents.

Codes that shape design

Beyond zoning, your plans must meet the California Building Standards and Energy Code. Structural design, seismic safety, stairs, ceiling heights, and fire safety requirements flow from Title 24. For energy, additions commonly trigger envelope, mechanical, and lighting compliance under Title 24, Part 6. You can learn more from the California Building Standards Commission and the California Energy Commission’s Building Energy Efficiency Standards.

If your lot is near shorelines or on older fill, geotechnical constraints such as liquefaction or settlement may shape your foundation plan. The California Geological Survey’s seismic hazard resources and the USGS earthquake program provide background mapping you and your engineers can reference.

Permit steps and timeline

A second story is a permitted, plan‑checked project. Expect several rounds of design and review before you build.

Step‑by‑step path

  • Preliminary research: Verify your zoning, height limit, setbacks, lot coverage, and any overlays with City Planning. Ask about pre‑application options.
  • Program and design: Define goals and square footage. Consider stair placement and circulation so the plan works on both floors.
  • Bring in professionals: Engage an architect or design professional and a licensed structural engineer early. For near‑shore or uncertain soils, add a geotechnical engineer to the team.
  • Prepare submittals: Create architectural plans, structural plans and calculations, a site plan, Title 24 energy forms, and any geotechnical report if needed. If your area requires design review, prepare those materials too.
  • Submit for plan check: Apply through Building & Safety for routing to Planning, Building, and Fire as needed. The City’s Development Services portal outlines process and submittal expectations.
  • Address corrections: Plan for at least one correction cycle. Consolidate responses and resubmit promptly to keep momentum.
  • Pull permits: Once approved, pay permit fees and post your permit placard on site.
  • Inspections: Schedule inspections at milestones such as foundations, framing, rough MEP, insulation and energy items, and final.

How long it takes

Design can take weeks to months depending on scope and team availability. City plan check often runs 4 to 12 weeks or more, with the option for expedited review when available. Construction can range from several months for modest projects to 6 to 12 months for larger builds. Historic review, variances, or coastal considerations can add time.

Engineering and design must‑knows

A second story changes loads on your home. Early engineering helps you avoid redesigns and surprise costs.

When to hire engineers

Bring a structural engineer in at concept stage. Many older one‑story homes were not built for a second‑story load path. Your engineer will check your foundation, shear walls, and connections, and will outline retrofit needs. If you are close to the coast or on reclaimed soils, a geotechnical engineer can evaluate liquefaction or settlement risk and recommend foundation solutions. For HVAC and electrical, involve experienced MEP pros if you plan major system changes. An energy consultant or HERS rater can streamline Title 24 compliance.

What they will check

  • Foundation capacity: Footings and slabs must support added vertical loads; underpinning or new grade beams may be required.
  • Lateral resistance: Shear walls, diaphragms, and hold‑downs must meet seismic demands. Expect added straps and connectors where you tie new framing into the old.
  • Floor framing: Floors must meet live load and deflection limits for comfort and code compliance.
  • Egress and heights: Stairs and ceiling heights must meet code, and any fire separation between units applies when relevant.
  • Soil behavior: On near‑shore sites, liquefaction or corrosion risks can influence foundation type and detailing.

Zoning limits and neighbor relations

Careful design helps you meet rules and maintain good relationships on your block.

Height planes, stepbacks, and views

Upper floors may need to step back from side or front property lines to respect setback and height plane rules. The exact limits depend on your zoning district and any overlays. Because private view rights are not generally guaranteed by the City, most view issues are negotiated through design or, when required, during public noticing for variances or design review. Confirm your property’s specifics with Planning before you finalize massing.

Neighbor‑friendly design moves

  • Windows: Use high or clerestory windows, or frosted glass on side elevations to preserve privacy.
  • Stepbacks: Step the second story in from the yard sides to reduce perceived bulk and shading.
  • Balconies: Limit or screen balconies facing neighboring yards; place outdoor spaces to the rear or where impacts are lowest.
  • Landscaping: Add evergreen screening where allowed to soften views between properties.
  • Materials: Choose colors and finishes that fit neighborhood patterns to ease design review.

During construction, share schedules and milestones with neighbors. A simple construction management plan that addresses noise hours, dust control, debris hauling, and worker parking can reduce complaints and inspection delays. Post your permit placard and a site contact so people know whom to call if an issue pops up.

Common delays and how to avoid them

Most slowdowns are predictable. You can plan ahead and keep your project moving.

  • Incomplete submittals: Missing structural calculations, Title 24 documents, or required geotechnical reports trigger corrections. Use the City’s checklist and confirm requirements at intake.
  • Late zoning discoveries: If your house is already nonconforming to setbacks, an upper floor can trigger variances or changes. Order an accurate site survey early and verify zoning with Planning.
  • Underestimating retrofit: Assuming the foundation is fine can lead to redesigns. Have a structural engineer evaluate it before final plans.
  • Energy errors: Title 24 details and HERS verifications are easy to miss. Involve an energy specialist so your forms and details align with the plans.
  • Historic or HOA review: These steps add time. Identify overlays and HOA requirements at the start and build them into your timeline.
  • Fees: Plan check, permits, inspections, and possible impact or school fees are due at milestones. Review fee schedules early or ask the City for an estimate.

Budget and value basics

Second stories add significant square footage, but they also add structural and systems work. The largest cost drivers include foundation upgrades, seismic hardware, stair construction, new roofing and exterior finishes, and expanded HVAC, plumbing, and electrical. Energy compliance and testing add line items too.

A permitted addition typically increases your assessed value. For questions about reassessment after improvements, visit the Los Angeles County Assessor. Proper permitting also helps avoid title and resale issues later.

Quick pre‑submittal checklist

  • Confirm your zoning, height limit, setbacks, and any overlays with Long Beach Planning.
  • Order an as‑built site survey and document existing floor plans.
  • Have a structural engineer assess the foundation and lateral system.
  • If near shorelines or on suspect soils, consult a geotechnical engineer.
  • Complete architectural plans, structural calculations, and Title 24 energy documentation.
  • Check for historic district or HOA design rules and timelines.
  • Ask Development Services about current plan check timelines and expedited options.
  • Outline neighbor outreach and a basic construction management plan.

Final thoughts and next steps

A well‑planned second story can transform how you live, but the best outcomes start with early verification, the right team, and a realistic timeline. Use City resources to confirm your parcel’s rules, pull in engineering early, and design with neighbors in mind to avoid hearings and delays. If you are weighing the investment against moving to a larger home, a local market perspective can help you compare costs, timing, and resale value.

Curious how a second story might affect your home’s value or your longer‑term plans? Reach out to Unknown Company for a no‑pressure conversation about today’s market and options that fit your goals.

FAQs

Do I need a permit for a second story in Long Beach?

  • Yes. Any structural work or addition of habitable area requires a building permit, plan check, and inspections through Long Beach Development Services.

Which City departments handle second‑story additions in Long Beach?

  • Planning verifies zoning and overlays, and Building & Safety handles plan review, permits, and inspections. Start with the City’s Development Services and Planning Division pages.

How long does plan check usually take for a second story?

  • Many projects see 4 to 12 weeks for initial plan check. Complex designs, historic review, variances, or coastal factors can add additional months.

When should I hire a structural engineer for a second story?

  • Bring a structural engineer in at concept stage. Foundation and lateral capacity often dictate feasibility, cost, and whether retrofit work is required.

Will my neighbor’s view block my second‑story plan?

  • Private view rights are generally based on easements or CC&Rs, not guaranteed by the City. Some discretionary reviews consider view impacts; check your title and confirm the review path with Planning.

Find Your Dream Home

Browse active listings in the area or contact us for off-market listings.

Home Search

What's Your Home Worth?

Have an expert help you find out what your home is really worth.

Home Valuation

Let's Work Together

Gary has a true passion for the real estate business and prides himself on staying up to date on current market conditions, latest real estate trends, and innovation that can help him and his clients to be more successful when working together.